[cups.bugs] [LOW] STR #3130: The schedulers Restart-Job operation needs to honor "job-hold-until"
Opher Shachar
ophers at ladpc.co.il
Sat Mar 14 14:51:09 PDT 2009
DO NOT REPLY TO THIS MESSAGE. INSTEAD, POST ANY RESPONSES TO THE LINK BELOW.
[STR New]
Hello,
In rfc2911 http://www.ietf.org/rfc/rfc2911.txt
section 3.3.7.1 states:
3.3.7.1 Restart-Job Request
The groups and attributes are the same as for a Cancel-Job request
(see section 3.3.3.1), with the addition of the following Group 1
Operation attribute:
"job-hold-until" (type3 keyword | name(MAX)):
The client OPTIONALLY supplies this attribute. The IPP object
MUST support this Operation attribute in a Restart-Job request,
if it supports the "job-hold-until" Job Template attribute in
create operations. See section 4.2.2. Otherwise, the IPP
object NEED NOT support the "job-hold-until" Operation
attribute in a Restart-Job request.
If supplied and supported as specified in the Printer's "job-
hold-until-supported" attribute, the IPP object copies the
supplied Operation attribute to the Job object, replacing the
job's previous "job-hold-until" attribute, if present, and
makes the job a candidate for scheduling during the supplied
named time period. See section 4.2.2.
[etc...]
But the schedulers Restart-Job IPP operation does not consider
"job-hold-until" in its implementation.
Regards,
Opher Shachar.
Link: http://www.cups.org/str.php?L3130
Version: 1.3-current
More information about the cups
mailing list